Index
|
Tunnel 1 |
Tunnel 2 |
Tunnel 3 |
Between 3&4 |
North of Tunnel 4 |
RGHQ 9.2 |
Here are the bays to the right. Starting with the second one from the entrance.
Gallery 29 - Assembly |
Continuing into Gallery 29 - Assembly |
Gallery 28 - Raw Material View |
Gallery 27 - Approved Material Store |
|
Continuing into Gallery 26a - Progress and Waiting Time Office |
Gallery 25 and 25a - Etching Shop and Anodising, Pickling & Chromating |
Gallery 24 - Tool Room |
Gallery 23 - General Section |
RETURN
TO TUNNEL 1
© 2009 J.R.Bryan
All images on this page are protected under copyright law. They may not be reproduced in any form or location electronically or in print without prior written permission from the copyright owner.